Church Lane

2015

Project Description: dRAW Architecture added the Rear Extension, Side Return and First Floor Extension to this London Property. We reconfigured the ground floor of the end of terrace property to create an open plan kitchen and dining area.

Time length of build: 5 months

Budget: £100,000.00

Structural engineer: ATLAS STRUCTURES

Contractor: Renovations TM


© 2019 dRAW Architecture. All Rights Reserved.