Clapham Apartment

2016

Project Description: dRAW have transformed this flat in Clapham, with a full internal refurbishment.

Time length of build: 12 weeks

Budget: £60,000.00

Structural engineer: ATLAS STRUCTURES

Contractor: D&M Zaba Construction


© 2019 dRAW Architecture. All Rights Reserved.