Fullerton Road

2016

Project Description: This project entails the construction of a Side Return, Loft Conversion and Refurbishment of the entire property.

Time length of build: 11 months

Budget: £300,000.00

Structural engineer: ATLAS STRUCTURES

Contractor: On request


© 2019 dRAW Architecture. All Rights Reserved.