Glass Box

2015

Project Description: Loft Extension and First Floor Extension to a family home in South West London.

Time length of build: 4 months

Budget: On request

Structural engineer: ATLAS STRUCTURES

Contractor: I Dekov Ltd


© 2019 dRAW Architecture. All Rights Reserved.