PREVIOUS NEXT

dRAW HQ

dRAW HQ

The evolution of the office has driven a more fluid and welcoming workspace to boost the productivity and morale, and at dRAW we have done exactly that.

The renovation of a previous gallery space into our dRAW HQ has revolutionised the former gallery space into a sleek new architectural practice.

The traditional shop-front entrance opens into the welcoming reception space. A large void with glass balustrades reflects light down toward the lower level. Detailed ceilings and Grestec grey partitions help define spaces without isolation. The tranquil colour scheme and natural lighting help keep the space calm and relaxed. 

Details

  • Year of Completion

    2016

  • Time Length of Build

    3 months

  • Structural Engineer

    Atlas Structures

  • Contractor

    Renovations TM