Shakespeare Road

2016

Project Description: This Family Home had an entire renovation including a Loft Extension and Side Return.

Time length of build: 9 months

Budget: £190,000.00

Structural engineer: ATLAS STRUCTURES

Contractor: BEL London


© 2020 dRAW Architecture. All Rights Reserved.