St George’s Lane

2017

Project Description: Three modern town houses were created for a tight site in Worcester. Each house provides spacious accommodation over three levels with open views of the local church to the rear.

Time length of build: 6 months

Budget: £500,000.00

Structural engineer: ATLAS STRUCTURES

Contractor: EGM Homes.


© 2020 dRAW Architecture. All Rights Reserved.