Westgate Terrace

2017

Project Description: Full refurbishment to a flat in Chelsea including a Ground Floor Side Return & Internal Remodelling.

Time length of build: 4 months.

Budget: £80,000.00

Structural engineer: ATLAS STRUCTURES

Contractor: BEL London.


© 2020 dRAW Architecture. All Rights Reserved.